• English
  • عربي
  • Íris
  • Eesti keel
  • Polski
  • Dansk
  • Deutsch
  • Русский язык
  • Français
  • suomi
  • 한국어
  • dictionary variant
  • Nederlands
  • Latina
  • LëtzebuergeschName
  • Português
  • 日本語
  • Italiano
Search

How to apply for the grace period for DVS 2024/PSS?

2024-10-30 09:57:28

Click:

London Direct Vision Standard (label #DVS) Progressive Safety System (label #P

  London's Direct Visual Standard (hashtag #DVS) Progressive Safety System (hashtag #PSS) is now live ???? So what does this mean for you? HGVs over 12 tonnes will now need to have at least a DVS three star rating or be PSS compliant to continue operating in Greater London. Those who fail to meet these requirements will face a penalty notice every time they drive within the DVS boundary. However, eligible operators can still apply for a grace period. 

  Transport for London (hashtag #TfL) has extended the grace period until 4 May 2025 for operators who are able to provide evidence that they have arranged the installation work before the grace period ends, but this is not automatic and you must take some steps. To apply you must provide evidence that you have arranged for the installation of the PSS equipment. You can apply for the grace period here: https://lnkd.in/ee6cGr7H

  Want to order hardware? Feel free to contact Elitek at sales@elitekvehiclesafety.com 


Author: Shenzhen Elitek Electronics Co., Ltd
0
How to apply for the grace period for DVS 2024/PSS?
London Direct Vision Standard (label #DVS) Progressive Safety System (label #P
Long by picture save/share
你的喜欢,就是我坚持写下去的能量器
YouArticle
已有0人推荐

Contact Us

TEL: 0755-29041721

Email: Info@elitekvehiclesafety.com

ADD: 4/f, Bldg A, No. 6, Shuitian Road, Tongle Community, Baolong Street, Longgang District, 518116, Shenzhen, China.

 

 

Follow Us 

Copyright © 2025 Shenzhen Elitek Electronics Co., Limited  – All rights reserved

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了